Home Page

Site Intro.

System Overview

ExtremeSTP Sites

Selecting an ExtremeSTP

Above Ground Models

Below Ground Models

Example Projects

Owner's Responsibilities

Operation & Maintenance

Limited Warranty

State of Alaska Requirements

Bio-Microbics & FAST® Technology

Pricing

Contact Us

Engineering Manual (pdf)

Brochure (pdf)

Links

 


ExtremeSTP Cold Climate Sewage Treatment Plants
Table of Contents for ADEC Regulations & Checklists

 

  Regulations
    18 AAC 72 Wastewater Disposal Regulations (as amended through July 11, 2002)
   
  Plan Review Master Checklist
    Checklist of ADEC Checklists
   
  Wastewater System Checklists
    To obtain Approval To Construct
      Required for all wastewater submittals
        General Checklist for Approval to Construct
        Public Drinking Water System or Domestic Wastewater System Owner's Statement
        Domestic Wastewater System Data Sheet
        Fee Schedule
      Project Checklists:
        Treatment Works/Package Plant Checklist
        Utilidor, Collection, and Pumping Checklist
        Stabilization Pond Checklist
        Community & Alternate Soil Absorption System Checklist
          EPA Inventory of Injection Wells (Form 7520-16) (for any soil absorption system other than for a single family home or duplex)
          Groundwater nitrate modeling for subsurface discharges >=2500 gpd
        Holding Tank Checklist
        Waiver Request Checklist
        Soils Analysis & Report (needed for Waiver, Holding Tank, SAS, and Pond)
        Marine & Surface Waters Outfall Disposal System Checklist (work with Air & Water Quality for permit)
        Disposal to Land Surface (work with EH-Plan Review Engineer for permit requirements)
    To obtain Approval To Operate
        Interim Approval to Operate for Domestic Wastewater Systems
          Written Notification that construction is complete
        Approval to Operate Checklist
          Completion of all items listed in Approval to Construct Letter from ADEC
   
  Public Water System Checklists
    Required for all Class A or B Drinking Water Projects:
      General Checklist for Water System Approval to Construct
      Public Drinking Water System or Domestic Wastewater System Owner's Statement
      GWUDISW Determination Checklist for a New Water Source
      Sample Siting Plan
      Capacity Development (for new Class A PWS only) (new forms under development)
    Project checklists and documents for Class A or B:
      Approval to Construct Well
      Approval to Construct Surface Water Intake or Source Known to be Under the Direct Influence of Surface Water
      Well Log Checklist
      Approval to Construct Treatment System Meeting the Surface Water Treatment Requirements of 18 AAC 80.600-690
      Approval to Construct Water Storage Tank
      Approval to Construct Distribution System
      Approval to Construct Other Treatment System (softeners, membrane systems, corrosion control, application to demonstrate innovative technology or device) (new forms under development)
      Waiver Requests Checklist
      Alaska Public Water Systems Latitude/Longitude Data
      Water Rights Application
      Checklist to Obtain Operation Approval for Existing Class A and B Public Water Systems Seeking Approval for Alternate Design
        Report
        Sampling
        Operation & Maintenance
        Advisements for Public Water Systems
    Class C PWS
      Class C Registration Form
        Nitrate Analysis Results
        Coliform Analysis Results
        Operating records sufficient to demonstrate that the system meets 1 NTU turbidity and disinfection residual requirements (optional)
         

 

 

 

copyright ©2000-2005 Lifewater Engineering Company
site last modified: January 25, 2005